Worcester Polar Park

Tight Line Construction joined the terrific Gilbane/Hunt Joint Venture team to complete the Worcester Polar Park, the most impressive Triple A baseball park ever built. Especially impressive was the project team’s ability to deliver a project so large in scale and complexity with top notch safety. The project was able to achieve its COO even working through the Covid Pandemic. Our scope of work included a wide array of services across several CSI divisions including:

  1. Spray Applied Fireproofing

  2. Spray Insulation (Sprayed Acoustic Insulation & SPF)

  3. Rough Carpentry, Wood Blocking, & Expansion Joints

  4. Exterior Wall Systems (Cold-Formed Metal Framing & Sheathing)

  5. Structural Cold-Formed Metal Framing & Floor Panels (Raised Floor Systems)

  6. Non-Structural Metal Framing & Drywall

  7. Insulation & Firestopping

  8. HM Doors, Frames, & Hardware

  9. Division 10 & 12 Specialties (fire protection specialties, corner guards, & window treatments)

  10. FRP


Scope of Work: Drywall & General Trades

Location: Worcester, MA

Year Completed: 2021